R5-1660-1669 - Panel Pal Roto R5 SMALL BELL: Shall be die-cast using 356.1 aluminum alloy and will have a multi-stage baked-on powder coat finish. HDPE PARTS (ALL): Shall be made from high density 3/4" sheet plastic specially formulated for optimum UV stability and color retention. PANEL PAL ROTO FRAME: Shall be constructed of UV-stabilized, rotationally molded, linear, low density polyethylene with an average wall thickness of .250". PANEL PAL MIRROR STEEL: Shall be fabricated using 16 ga. 304 #8 HPSS. HARDWARE: Shall be stainless steel, zinc/nickel plated or galvanized as required to resist rust and corrosion. 1689-TSTTT - Train Station Tic-Tac-Toe HDPE PART: Shall be made from high density 3/4" sheet plastic specially formulated for optimum UV stability and color retention. TURN BLOCK: Shall be constructed of UV-stabilized, rotationally molded, linear, low density polyethylene with an average qwall thickness of .250". ACTIVITY PANEL TUBE 29.5": Shall be fabricated using 0.75" galvanized EMT 18ga. steel tubing and will have a multi-stage baked-on powder coat finish. SOCKET CLAMPS: Shall be two-part and precision die-cast from a high strength aluminum alloy and will have a multi-stage baked-on powder coat finish. MOUNTING LUGS: Shall be precision die-cast from a high-strength aluminum alloy and will have a multi-stage baked- on powder coat finish. HARDWARE: Shall be stainless steel, zinc/nickel plated or galvanized as required to resist rust and corrosion. 1710-SUP - Twister Slide Support Assembly The Sectional Slide Support Bracket #2 shall be fabricated using 3/16"HR sheet steel and will have a multi-stage baked-on powder coat finish. The Twister Slide Support shall be fabricated using Ø1.660 steel tubing, 3/16" HR sheet steel and 5/8"round bar and will have a multi-stage baked-on powder coat finish. The Twister Slide Support Top shall be fabricated using Ø2.000 steel tubing and 3/16" HR sheet steel and will have a multi-stage baked-on powder coat finish. The Twister Slide Support Bottom shall be fabricated using Ø1.660 steel tubing and 1/4" HR sheet steel and will have a multi-stage baked-on powder coat finish. 1980 - Counter Connection Assembly The Counter Connection Top shall be made from high density 3/4" sheet plastic specially formulated for optimum UV stability and color retention. The Counter Connection Frame shall be fabricated using 1.5" x 3" rectangle tube with welded 12 gauge steel end caps and will have a multi-stage baked-on powder coat finish. The Counter Connection Leg shall be fabricated using 2.375" O.D. 11 gauge round tube, 1/4" HR sheet steel and 5/8" O.D. round bar and will have a multi-stage baked-on powder coat finish. The Counter Connection Post Mount shall be fabricated using 2.375" O.D. 11 gauge round tube and 1/4" HR sheet steel and will have a multi-stage baked-on powder coat finish. The Mounting Blocks shall be two-part and precision die-cast from a high strength aluminum alloy and will have a multi-stage baked-on powder coat finish. R5-1514-FIRE - Fire Truck Rescue Arm Bridge R5 The Socket Clamps shall be two-part and precision die-cast from a high strength aluminum alloy and will have a multi-stage baked-on powder coat finish. The Mounting Inserts shall be precision die-cast from a high-strength aluminum alloy. The Fire Truck Rescue Arm Bridge Walls shall be fabricated using 1.315" O.D. 12 gauge steel tubing with welded 1.029" O.D. 14 gauge vertical rails, and attached to Rectangle 1.5" x .25" x .12" steel tubing with welded 1/4" thick steel clevises and will have a multi-stage baked-on powder coat finish. The Inclined Arch Bridge shall be fabricated using punched, formed, and welded 12 gauge sheet steel and shall be Play-Tuffâ„¢ coated after fabrication. The Fire Truck Rescue Arm Bridge Panels and Trim shall be made from high density 3/4" sheet plastic specially formulated for optimum UV stability and color retention. 1623-DC - Dual Cab Fire Truck The Half Square Deck R5 shall be fabricated using punched, formed and welded 12 gauge sheet steel and will be Play-Tuffâ„¢ coated after fabrication. The Fire Truck Ladder Weldment shall be fabricated using 1 1/2" x 3" 11 gauge rectangle steel tubing with welded 1.029" O.D. 14 gauge tube steel, 3/16" HR flanges and 1/4" thick steel clevises and will have a multi-stage baked-on powder coat finish. The Light Bar shall be fabricated using 1.029" O.D. 14 gauge steel tubing, 1 1/2" x 3" rectangle steel tubing with welded 1/4" HR steel clevis's and will have a multi-stage baked-on powder coat finish. The truck Bus Bumper shall be fabricated sing 1.029" O.D. 14 gauge steel tubing with welded 10 gauge steel mounting tabs and will have a multi-stage baked-on powder coat finish. The Dash Frame shall be fabricated using punched, formed and welded 12 gauge sheet steel and will be Play-Tuffâ„¢ coated after fabrication. The Safari Truck Diver Wheel Mount shall be fabricated using 2.375" O.D. 10 gauge steel tubing with welded 3/16" thick steel mounting plate and Ø1" stainless steel spindles and will have a multi-stage baked-on powder coat finish. The Driver Wheel Casting shall be precision die-cast from a high-strength aluminum alloy and will have a multi-stage baked-on powder coat finish. The Wheel Hub shall be fabricated from a high-strength aluminum alloy and will have a multi-stage baked-on powder coat finish. The Spring Rider Bracket & Castle Tab shall be precision laser-cut and formed from 3/16" sheet steel and will have a multi-stage baked-on powder coat finish. The Panels / Trim shall be made from high density 3/4" sheet plastic specially formulated for optimum UV stability and color retention. The Mounting Blocks and Socket Clamps shall be two-part and precision die-cast from a high strength aluminum alloy and will have a multi-stage baked-on powder coat finish. The Mounting Inserts shall be precision die-cast from a high-strength aluminum alloy. 1706-S - Sectional Spiral Slide Assembly The Spiral Slide Deck shall be precision cut, formed, and welded using 12 gauge thick steel and shall be Play-Tuff(TM) coated after fabrication. The Twister Slide Sections & Hood shall be constructed of UV-stabilized, rotationally molded, linear, low density polyethylene with an average wall thickness of .250". The Twister Slide Spacer & Infinity Wall Trim shall be made from high density 3/4" sheet plastic specially formulated for optimum UV stability and color retention. The Single Slide Leg shall be fabricated using 1.660" 11 gauge steel tubing with 10 gauge HR steel and 5/8" round bar and will have a multi-stage baked-on powder coat finish. The Sectional Spiral Slide Wall shall be fabricated using 1.315" 12 gauge steel tubing and 1.029" 14 gauge steel tubing with 1/4" HR steel clevis and will have a multi-stage baked-on powder coat finish. The Infinity Wall Sectional Spiral Slide Wall shall be fabricated using 1.315" 12 gauge steel tubing, 12ga HR sheet steel and 1/4" HR steel clevis and will have a multi-stage baked-on powder coat finish. The Twister Sit Down Side Guard Canada shall be fabricated using 1.029" 14 gauge steel tubing with 10 gauge HR steel and will have a multi-stage baked-on powder coat finish. The Sectional Slide Support shall be fabricated using 1.660" 11 gauge steel tubing with 3/16" HR steel 5/8" round bar and will have a multi-stage baked-on powder coat finish. The Sectional Slide Support Bracket shall be fabricated using 3/16" HR steel and will have a multi-stage baked-on powder coat finish. The Roto Panel Deck Mounting Plate shall be fabricated using 1/4" HR steel and will have a multi-stage baked-on powder coat finish. The Mounting Blocks shall be two-part and precision die-cast from a high strength aluminum alloy and will have a multi-stage baked-on powder coat finish. RV 1961 - Tri-Pad The Tri-Pad shall be constructed of UV-stabilized, rotationally molded, linear, low density polyethylene with an average wall thickness of .250". The Step Pad Leg shall be fabricated using 1.660" O.D. 11 gauge steel tubing with welded 1/4" thick steel mounting plate. The Step Pad Leg will be Powder Coated as specified. R5-12891 - Center Access Climber The Center Access Climber R5 shall be fabricated using Ø 1.660 11 gauge steel tubing with welded Ø 1.315" 12 gauge steel rungs and Ø 1.029" 14 gauge steel rails and will be Powder Coated as specified. The Center Access Square Deck R5 shall be fabricated using punched R5 1689 - City Scape Assembly The City Scape Panels & Trim shall be made from high density 3/4" sheet plastic specially formulated for optimum UV stability and color retention. The Castle Tab 30 Degree shall be precision cut and formed from 3/16" thick sheet steel and will be Powder Coated as specified. The Flat Panel bracket shall be precision cut from 3/16" thick sheet steel and will be Powder Coated as specified. The Store Panel Counter Bracket shall be precision cut and formed from 3/16" thick sheet steel and will be Powder Coated as specified. The Truck Handle Small shall be fabricated using 1.029" O.D. 14 gauge steel tubing with welded 10 gauge sheet steel mounting plates and will be Powder Coated as specified. The Mounting Lugs shall be precision die-cast from a high-strength aluminum alloy and will be Powder Coated as specified. The Socket Clamps shall be two-part and precision die-cast from a high strength aluminum alloy and will be Powder Coated as specified. R5-1602 - Panel Type 2 (HDPE) The Panel Type 2 HDPE shall be made from high density 3/4" sheet plastic specially formulated for optimum UV-stability and color retention. The Flat Panel Bracket shall be precision laser-cut from 3/16" sheet steel and will be Powder Coated as specified. The Mounting Lugs shall be precision die-cast from a high strength aluminum alloy and will be Powder Coated as specified. R5-1601 - Panel Type 1 (Rotomold) The Roto Panel shall be constructed of UV-stabilized, rotationally molded, linear, low density polyethylene with an average wall thickness of .250". The Panel Roto Pipe shall be fabricated using Ø1.315 12ga steel tubing. The Roto Panel Bracket shall be fabricated using 10ga sheet steel and will have a multi-stage baked-on powder coat finish. The Socket Clamps shall be two-part and precision die-cast from a high strength aluminum alloy and will have a multi-stage baked-on powder coat finish. R5 1309 - Half Wall (Handle) Assembly The Half Wall R5 shall be constructed of 1.315" O.D. 12 gauge tube steel outer rails with 1.029" O.D. 14 gauge tube steel welded vertically. The Half Wall may also have welded mounting tabs and/or plates and will be Powder Coated as specified. R5 1229 - Cross Loop Climber The Cross Loop Climber shall be constructed of 1.660" O.D. 11 gauge tube steel with welded 1.315" O.D. 12 gauge tube steel handles, rungs, and 3/16" thick steel mounting plate and will be Powder Coated as specified. R5 1213 - Firepole Assembly The Firepole shall be fabricated of 1.660" O.D. 11 gauge steel tubing with a .375" steel tab welded onto the end and will be Powder Coated as specified. The Firepole Tab Blocker shall be fabricated from 12 gauge sheet steel and will be Powder Coated as specified. R5 1211 - Vertical Step Filler The Vertical Step Filler shall be punched and formed from 12 gauge sheet steel and shall be Play-Tuff(TM) coated after fabrication. The Mounting Lugs shall be precision die-cast from a high strength aluminum alloy and will be Powder Coated as specified. R5 1100 - Deck Identification NO SPECIFICATIONS 1962 - Play Seat The Play Seat shall be punched and formed from 14 gauge sheet steel and shall be Play-Tuff(TM) coated after fabrication. The Mounting Blocks shall be two-part and precision die-cast from a high strength aluminum alloy and will be Powder Coated as specified. 1310 - Transition Wall The Transition Wall shall be fabricated from 1.315" O.D. 12 guage steel tubing, welded 1.029" O.D. 14 guage vertical rails and handles and 1/2" thick steel tabs and will have a multi-stage baked on powder coat finish. The Socket Clamps shall be two-part and precision die-cast from a high strength aluminum alloy and will have a multi-stage baked on powder coat finish. 1221 - Chain Net Climber shall be constructed of 1.315" O.D. 12 gauge steel rungs affixed to 5/0 chain on 12" centers to form a complete chain net unit and will have a Play-Tuff(TM) coating. The Chain Net Foot shall be fabricated of 1/4" thick steel bent 90° with welded on rebar extensions and will be Powder Coated as specified. The Optional Handrails shall be made from 1.315" O.D. tube steel and welded into the appropriate shape and will be Powder Coated as specified. The Mounting Blocks shall be two-part and precision die-cast from a high strength aluminum alloy and will be Powder Coated as specified. 1209 - Transfer Station The Steps & Decks shall be fabricated from 12 gauge punched sheet steel with reinforcing cross members and gussets. Each Step and Deck shall be Play-Tuff(TM) coated after fabrication. The Step Rails shall be fabricated from 1.315" O.D. 12 gauge and 1.660" O.D. 11 gauge steel tubing and will be powder coated as specified. The Step Deck Legs shall be fabricated from 1.660" O.D. 11 gauge steel tubing welded to a 10 gauge mounting bracket. The Step Deck Leg will be Powder Coated as specified. 1103 - Half Hex Deck 5 Post Assembly The Half Hex Deck 5 Post shall be constructed using 12 gauge sheet steel which shall be formed and fabricated into required designs and punched with a uniform hole pattern and shall be Play-Tuff(TM) coated after fabrication. The Mounting Blocks shall be two part and precision die-cast from a high strength aluminum alloy and will be Powder Coated as specified. 1101 - Square Deck Assembly The Square Deck shall be constructed using 12 gauge sheet steel which shall be formed and fabricated into required designs and punched with a uniform hole pattern. The Decks will be Play-Tuff(TM) coated after fabrication. The Mounting Blocks shall be two part and precision die- cast from a high strength aluminum alloy. The Mounting Blocks will be Powder Coated as specified.