1632 - Bugeye Panel The Round Trim shall be made from high density 3/4" sheet plastic specially formulated for optimum UV stability and color retention. The Bugeye Bubble shall be fabricated from 3/16" Clear Polycarbonate. 1948 - Surf Rider The Surf Rider Deck shall be constructed of UV-stabilized, rotationally molded, linear, low density polyethylene with an average wall thickness of .250" and will be Powder Coated as specified. The Surf Rider Support shall be fabricated using 2.375" O.D. 10 gauge steel tubing with welded 1/4" thick steel split collars, and 3/16" thick steel anchors and pipe plug and will have a multi-stage baked-on powder coat finish. The Surf Rider Chain shall be 7mm (1/4") PC Grade 30 chain with a silver shield cold galvanized finish. The Split Collar Half shall be precision laser-cut from 1/4" thick rolled sheet steel and will have a multi-stage baked-on powder coat finish. R5-1362 - Steel Push-Out Wall The Steel Push-Out Wall shall be fabricated from 1.029" O.D. 14 gauge tubing and 1.315" O.D. 12 gauge tubing with welded on 1/4" thick steel plate and will have a multi-stage baked-on powder coat finish. The Push-Out Seat Panel, Push-Out Wall Round Event Panel, Pushout Seat & Supports shall be made from high density 3/4" sheet plastic specially formulated for optimum UV stability and color retention. The Bug Eye Bubble shall be constructed of 3/16" Clear Polycarbonate. The Socket Clamps shall be two-part and precision die-cast from a high strength aluminum alloy and will have a multi-stage baked-on powder coat finish. 1709 - Portal Slide The Slide Sections shall be constructed of UV-stabilized, rotationally molded, linear, low density polyethylene with an average wall thickness of .250". The Tube and Portal Slide Supports shall be an assembly with two components. The Leg shall be fabricated using 2.375" O.D. 10 gauge steel tubing and 1.660" O.D. 11 gauge steel tubing with welded 1/4", 3/16" thick steel caps, and 5/8" steel rod and will have a multi-stage baked-on powder coat finish as specified. The Bracket shall be fabricated using 1.660" O.D. 11 gauge steel tubing with welded 1/4" thick steel plate and will have a multi-stage baked-on powder coat finish as specified. The Twister Slide Supports shall be an assembly with two components. The Leg shall be fabricated using 1.660" O.D. 11 gauge steel tubing with welded 3/16" thick steel bracket and 5/8" steel rod and will have a multi-stage baked-on powder coat finish as specified. The Bracket shall be punched and formed from 3/16" thick steel and will have a multi-stage baked-on powder coat finish as specified. The Slide Leg shall be fabricated using 1.660" O.D. 11 gauge steel tubing with welded 10 gauge steel plate and will have a multi-stage baked-on powder coat finish as specified. R5 1807 - Poly Shingled Roof The Poly Shingled Roof shall be manufactured from UV-stabilized LLDPE (linear low- density polyethylene) with an average wall thickness of 1/4". The Roof Support Casting shall be precision die-cast from a high strength aluminum alloy. The Roof Support Casting will be Powder Coated as specified. R5-1601 - Panel Type 1 (Rotomold) The Roto Panel shall be constructed of UV-stabilized, rotationally molded, linear, low density polyethylene with an average wall thickness of .250". The Panel Roto Pipe shall be fabricated using Ø1.315 12ga steel tubing. The Roto Panel Bracket shall be fabricated using 10ga sheet steel and will have a multi-stage baked-on powder coat finish. The Socket Clamps shall be two-part and precision die-cast from a high strength aluminum alloy and will have a multi-stage baked-on powder coat finish. R5 1535 - Crawl-Netix Climber R5 The Crawl-Netix Flange Stiffeners shall be made from high density 3/4" sheet plastic specially formulated for optimum UV stability and color retention. The Crawl-Netix Net Plate shall be cut from 1/4" thick sheet steel and will be Powder Coated as specified. The Crawl-Netix Net shall be made from 16mm steel-reinforced rope with high-strength co-polymer plastic intersection connectors and machined aluminum and clevises. The Crawl-Netix Rail shall be fabricated using 1.660" O.D 11 gauge steel tubing with welded 10 gauge steel plate and will be Powder Coated as specified. The Tube Elbow shall be constructed of UV-stabilized, rotationally molded, linear, low density polyethylene with an average wall thickness of .250". The Tube Support Plate shall be cut from 1/4" thick sheet steel and will be Powder Coated as specified. The Roto Panel Leg shall be fabricated using 1.660" O.D 11 gauge steel tubing with welded 3/16" thick bracket, and a 1/4" thick steel plate and will be Powder Coated as specified. The Roto Round Panel shall be constructed of UV-stabilized, rotationally molded, linear, low density polyethylene with an average wall thickness of .250". R5 1525 - Ramp Link R5 The Grip Ramp Brackets shall be two part laser-cut and welded 1/4" steel and will be Powder Coated as specified. The Ramp Link shall be fabricated using punched, formed and welded 12 gauge sheet steel and shall be Play-Tuff(TM)coated after fabrication. The Ramp Link Wall shall be fabricated using 1.315" O.D. 12 gauge steel tubing with welded 1.029" O.D. 14 gauge steel vertical rails and 1/4" thick steel tabs and will be Powder Coated as specified. The Socket Clamps shall be two-part and precision die-cast from a high strength aluminum alloy and will be Powder Coated as specified. The Toddler Grips shall be made from high density 3/4" sheet plastic specially formulated for optimum UV stability and color retention. R5 1309 - Half Wall (Handle) Assembly The Half Wall R5 shall be constructed of 1.315" O.D. 12 gauge tube steel outer rails with 1.029" O.D. 14 gauge tube steel welded vertically. The Half Wall may also have welded mounting tabs and/or plates and will be Powder Coated as specified. R5 1305 - Double Sit Down The Double Sit Down Wall shall be fabricated from 1.315" O.D. 12 gauge tube steel welded to a 1.029" O.D. 14 gauge steel extender and will be Powder Coated as specified. R5 1303 TW - Twister Entry Panel w/ Sit Down Hood The Sit Down Hood Support shall be fabricated using 1.315 O.D. 12 gauge steel tubing with welded 1.029 O.D. 14 gauge steel tubing and a 10 gauge steel tab and will be Powder Coated as specified. The Slide Hood R5 shall be constructed of UV-stabilized, rotationally molded, linear, low density polyethylene with an average wall thickness of .250". The Twister Entry Panel for Slide hood shall be made from high density 3/4" sheet plastic specially formulated for optimum UV stability and color retention. The Mounting Lugs shall be precision die-cast from a high strength aluminum alloy and will be Powder Coated as specified. The Socket Clamps shall be two-part and precision die-cast from a high strength aluminum alloy and will be Powder Coated as specified. R5 1234 - Spiral Step Climber R5 The Spiral Step Climber shall be fabricated from 1.900" O.D. 11 gauge steel tubing with welded 1.315" O.D. 12 gauge steel tubing handles, tread supports, and 1/4" thick steel plates and will be Powder Coated as specified. The Spiral Step Climber Tread shall be made from high density 3/4" sheet plastic specially formulated for optimum UV stability and color retention. R5 1100 - Deck Identification NO SPECIFICATIONS 1937 - Crunch Handle The Crunch Handle R5 shall be fabricated using 1.315 O.D. 12 gauge steel tubing with a welded 0.625" H.R. round bar crossbar and will be powder coated as specified. The Crunch Handle R35 shall be made from high density 1" sheet plastic specially formulated for optimum UV stability and color retention. The Crunch Handle RV shall be fabricated using 1.315" O.D. 12 gauge steel tubing with a welded 0.625" H.R. round bar crossbar and 1/4" thick stainless steel mounting bracket and will be powder coated as specified. The Socket Clamps shall be two-part and precision die-cast from a high strength aluminum alloy and will be powder coated as specified. The Mounting Blocks shall be two-part and precision die-cast from a high strength aluminum alloy and will be powder coated as specified." 1812 - Driver Wheel to Post The Driver Wheel Casting shall be precision die-cast from a high strength aluminum alloy and will be Powder Coated as specified. The Wheel Hub shall be machined from 3-3/4" Dia. high strength aluminum alloy and will be Powder Coated as specified. The Steering Wheel to Post Bracket shall be precision laser cut from 1/4" thick rolled sheet steel with welded 1.660" 11 gauge steel tubing and 1" Dia. machined stainless steel spindle and will be Powder Coated as specified. The Split Collar Half shall be precision laser cut from 1/4" thick rolled sheet steel and will be Powder Coated as specified. 1710 - Twister Slide The Twister Slide shall be manufactured from UV-stabilized LLDPE (linear low-density polyethylene) with an average wall thickness of 1/4". The Single Slide Leg shall be fabricated of 1.660" O.D. 11 gauge tube steel welded onto a 10 gauge steel plate and will be Powder Coated as specified. The Twister Slide Support shall be fabricated of 1.660" O.D. 11 gauge tube steel welded onto a 3/16" steel plate and will be Powder Coated as specified. 1702 - Double Slide The Double Slide Spacer shall be fabricated using punched and formed 12 gauge sheet Steel and shall be Play-Tuff(TM) coated after fabrication. The Double Slide shall be manufactured from UV-stabilized LLDPE (linear low-density polyethylene) with an average wall thickness of 1/4". The Double Slide Leg shall be fabricated of 1.660" O.D. 11 gauge tube steel welded onto a 3/16" plate steel with a 5/8" steel rod welded to the base as a footing anchor and will be Powder Coated as specified. The Slide Support shall be fabricated of 1.660" O.D. 11 gauge steel tubing welded onto a 3/16" steel plate with a 5/8" steel rod welded to the base as a footing anchor and will be Powder Coated as specified. 1639 - Clubhouse Assembly The Clubhouse Panels and Trim shall be made from high density 3/4" thick hot extruded sheet plastic specially formulated for optimum UV stability and color retention. The Clubhouse Table Support shall be fabricated using 1.660" O.D. steel tubing welded to a 1/4" thick pipe plug with threaded insert and will be Powder Coated as specified. The Store Panel Counter Bracket shall be precision laser cut and formed from 3/16" sheet steel and will be Powder Coated as specified. The Mounting Lugs and Socket Clamps shall be precision die-cast from a high strength aluminum alloy and will be Powder Coated as specified. 1514 - Inclined Arch Bridge The Inclined Arch Bridge shall be fabricated using punched, formed, and welded 12 gauge sheet steel and shall be Play-Tuff(TM) coated after fabrication. The Inclined Arch Wall shall be fabricated using 1.315" O.D. steel tubing with welded 1.029" O.D. vertical rails and will be Powder Coated as specified. The Socket Clamps shall be two-part and precision die-cast from a high strength aluminum alloy and will be Powder Coated as specified. 1410 - Loop Traverse The Loop Traverse 90 Deg. Support shall be fabricated using 1.900" O.D. 11 gauge steel tubing with welded 1/2" thick steel mounting tab and will be Powder Coated as specified. The Loop Traverse 144" R5 shall be fabricated using 2.375" O.D. 10 gauge steel tubing with welded 1-1/2" x 3" 11 gauge steel supports, 1/2" thick steel tab, and 1/4" thick steel clevises and will be Powder Coated as specified. The Loop Traverse shall be fabricated using 2.375" O.D. 10 gauge steel tubing with welded 1-1/2" x 3" 11 gauge steel supports with 1/4" thick steel clevises and will be Powder Coated as specified. The Mounting Blocks shall be two-part and precision die-cast from a high strength aluminum alloy and will be Powder Coated as specified. 1400 - End Access Ladder The End Access Ladder shall be fabricated using 1.315" OD, 12 gauge steel tubing and will be Powder Coated as specified. The Socket Clamps shall be two-part and precision die-cast from a high strength aluminum alloy and will be Powder Coated as specified. 1310 - Transition Wall The Transition Wall shall be fabricated from 1.315" O.D. 12 guage steel tubing, welded 1.029" O.D. 14 guage vertical rails and handles and 1/2" thick steel tabs and will have a multi-stage baked on powder coat finish. The Socket Clamps shall be two-part and precision die-cast from a high strength aluminum alloy and will have a multi-stage baked on powder coat finish. 1282 - Curved Rung Ladder The Curved Rung Ladder shall be fabricated using 1.660" O.D. 11 gauge steel tubing with welded 1/4" thick steel mounting plates and 1.315" O.D. 12 gauge steel rungs and will be Powder Coated as specified. 1237 - Vertical Rock Climber The Vertical Rock Climber shall be made from high density 3/4" sheet plastic specially formulated for optimum UV-Stability and color retention. The Mounting Lug shall be precision die-cast from a high strength aluminum alloy and will be Powder Coated as specified. 1236 AL - Access Ladder The Erector Rock Access Ladder shall be fabricated from 1.315" O.D. 12 gauge tube steel welded to a .25" sheet steel Erector Rock Climber Plate and will be Powder Coated as specified. ER-3001/S-1236-3 - ERECTOR ROCK CURVED The Erector Rock Leg Shall be fabricated using 1.660" O.D. steel tubing with welded 1/4" thick steel mounting plate and will have a multi-stage baked-on powder coat finish. The Erector Rock Post shall be fabricated using 3.5" O.D. steel tubing with welded 1/4" thick steel mounting plate. The Erector Rock Steel Post shall have a multi-stage baked-on powder coat finish. The Erector Rock Wall & Caps shall be constructed of UV-stabilized, rotationally molded, linear, low density polyethylene with an average wall thickness of .250". The Wall Grip shall be two-part, and precision diecast from a high strength aluminum alloy. The Wall Grips will be Play-Tuff™ coated after fabrication. 1224 - Stacked Loop Climber The Stacked Loop Climber shall have main rails constructed of 1.660" O.D. 11 gauge tube steel with 1.315" O.D. 12 gauge tube steel stepping/gripping loops welded to the main rails and will be Powder Coated as specified. 1209 - Transfer Station The Steps & Decks shall be fabricated from 12 gauge punched sheet steel with reinforcing cross members and gussets. Each Step and Deck shall be Play-Tuff(TM) coated after fabrication. The Step Rails shall be fabricated from 1.315" O.D. 12 gauge and 1.660" O.D. 11 gauge steel tubing and will be powder coated as specified. The Step Deck Legs shall be fabricated from 1.660" O.D. 11 gauge steel tubing welded to a 10 gauge mounting bracket. The Step Deck Leg will be Powder Coated as specified. 1206 - ADA Steps with Walls The ADA Steps shall be fabricated using 12 gauge punched steel with reinforcing cross members and gussets. All surfaces to be Play-Tuff(TM) coated. The ADA Step Walls shall be fabricated using 1.315" O.D. 12 gauge steel railing welded to 1.029" O.D. 14 gauge evenly spaced vertical rungs with welded 1/4" brackets and will be Powder Coated as specified. 1102 - Tri Deck Assembly The Tri Deck shall be constructed using 12 gauge sheet steel which shall be formed and fabricated into required designs and punched with a uniform hole pattern and will be Play-Tuff(TM) coated after fabrication. The Mounting Blocks shall be two part and precision die- cast from a high strength aluminum alloy and will be Powder Coated as specified. 1101 - Square Deck Assembly The Square Deck shall be constructed using 12 gauge sheet steel which shall be formed and fabricated into required designs and punched with a uniform hole pattern. The Decks will be Play-Tuff(TM) coated after fabrication. The Mounting Blocks shall be two part and precision die- cast from a high strength aluminum alloy. The Mounting Blocks will be Powder Coated as specified.