1953 - Steel Net Wall Curved The Steel Net Wall Curved shall be fabricated using 2.375" O.D. 10 gauge steel tubing with welded 1.315" O.D. 12 gauge side rails, 1.029" O.D. 14 gauge steel cross members, clevises and will have a multi-stage baked-on powder coat finish. The Mounting Blocks shall be two-part and precision die-cast from a high strength aluminum alloy and will have a multi-stage baked-on powder coat finish. 1981 - Sensory Wall The Sensory Wall Leg shall be fabricated using 1.315" O.D. 12 gauge steel tubing with welded 5/8" O.D. steel anchor and will have a multi-stage baked-on powder coat finish. The Sensory Wall Leg - Surface Mount shall be fabricated using 1.315" O.D. 12 gauge steel tubing with welded 1/4" thick steel plate and will have a multi-stage baked-on powder coat finish. The Sensory Ramp Inserts shall be precision cut from 12 gauge sheet steel and will have a multi-stage baked-on powder coat finish. The Sensory Wall shall be fabricated using 1.029" O.D. 14 gauge and 1.315" O.D. 12 gauge steel tubing with welded 12 gauge and 1/4" thick steel tabs and flanges and will have a multi-stage baked-on powder coat finish. The Mounting Blocks shall be two-part and precision die-cast from a high strength aluminum alloy and will have a multi-stage baked-on powder coat finish. 1690-RMKR - Small Rain Maker Panel The Small Rain Maker Back Panel, Rain Maker Cover, Rain Maker Rotator, Spinner Hub, and Spacer shall be made from high density 3/4" sheet plastic specially formulated for optimum UV stability and color retention. The Small Rain Maker Window shall be made from .118 Polycarbonate sheet. 5303 - NFuse Snake Net Extension The NFuse Snake Net Extension - Frame Rail Ground Mount and Surface Mount shall be fabricated using 1-1/2" x 3" rectangle tube, Ø1.315" OD tube steel, 1/4" HR sheet steel and AISI 304 Anchor Clevises and will have a multi-stage baked-on powder coat finish. The NFuse Hex Net Extension - Net shall be made from 16mm steel-reinforced rope with high-strength copolymer plastic intersection connectors and machined aluminum end ferrules. The Socket Clamp Rope Clevis shall be precision cut and formed from 3/16" stainless steel. The Mounting Inserts shall be precision die-cast from a high-strength aluminum alloy. The Mounting Blocks & Socket Clamps shall be two-part and precision die-cast from a high strength aluminum alloy and will have a multi-stage baked-on powder coat finish. 1644-RND - Gear Panel Round The Gear Panel Components shall be made from high density 3/4" sheet plastic specially formulated for optimum UV stability and color retention. The Gear Panel Windows shall be made from .118 Polycarbonate sheet plastic. 1690-BELL - Small Bell & Hammer Panel The Small Bell and Hammer Panel & Hammer shall be made from high density 3/4" sheet plastic specially formulated for optimum UV stability and color retention. The Small Bell shall be precision die-cast from a high strength aluminum alloy and will have a multi-stage baked-on powder coat finish. 1690-CHM - Small Chime Panel The Chime Panels & Chime Hammer shall be made from high density 3/4" sheet plastic specially formulated for optimum UV stability and color retention. The Chime Panel Hubs & Spacers shall be made from high density 1" sheet plastic specially formulated for optimum UV stability and color retention. The Chimes shall be fabricated using 0.75" Galvanized EMT 18ga and will have a multi-stage baked-on powder coat finish. The Chime Panel Bracket shall be punched and formed using 3/16" sheet steel and will have a multi-stage baked-on powder coat finish. 1634 - Labyrinth Panel The Pin Ball Panel Mounting Ring, Labyrinth Panel Rotator, & Labyrinth Panel Front & Back Retainer shall be made from high density 3/4" sheet plastic specially formulated for optimum UV stability and color retention. The Labyrinth Window shall be made from .118 thick polycarbonate sheet plastic. 1445 - UltraZip The UltraZip End Beam shall be extruded from a high strength aluminum alloy with a welded machined aluminum pin. The UltraZip Straight Beam shall be extruded from a high strength aluminum alloy. The UltraZip Coupler shall be precision cut and welded 1/2" thick steel and will have a multi-stage baked-on powder coat finish. The UltraZip End Hanger shall be fabricated using 2.375" O.D. 10 gauge steel tubing with welded 1.900" O.D. 11 gauge support, 3/16" thick steel clevis, 1/4" thick stainless steel mounting brackets and 1/2" thick steel tie plate and will have a multi-stage baked-on powder coat finish. The UltraZip Junction Hanger shall be fabricated using 2.375" O.D. 10 gauge steel tubing with welded 1.900" O.D. 11 gauge support, 3/16" thick steel clevis, 1/4" thick stainless steel mounting brackets and 1/2" thick steel plate and will have a multi-stage baked-on powder coat finish. The UltraZip End Cap shall be fabricated from 3/8" steel and will have multi-stage baked-on powder coat finish. The UltraZip Deck shall be fabricated using punched, formed, and welded 12 gauge sheet steel. The UltraZip Deck shall be Play-Tuff coated after fabrication. The UltraZip Deck Legs shall be fabricated using 2.375" O.D. 11 gauge steel tubing with welded 10 gauge steel mounting plate and will have a multi-stage baked-on powder coat finish. The Split Collar Half shall be fabricated using 1/4" thick HR steel and will have a multi-stage baked-on powder coat finish. The UltraZip Beam Pin shall be fabricated using AISI 1045 cold drawn steel. The Hanger Pin shall be fabricated using AISI 303 stainless steel. The UltraZip Ramp shall be fabricated using punched, formed, and welded 12 gauge sheet steel and 2.875" O.D. sch. 40 pipe and shall be Play-Tuff coated after fabrication. The Grip Ramp Bracket shall be fabricated using precision cut and welded 1/4" thick steel and will have a multi-stage baked-on powder coat finish. The Grip Ramp Foot shall be fabricated using precision cut 1/4" thick steel and will have a multi-stage baked-on powder coat finish. The UltraZip End Cap Bumper shall be fabricated using PN 579108 D-Shaped, O-Bore Bumper. R5-1362 - Steel Push-Out Wall The Steel Push-Out Wall shall be fabricated from 1.029" O.D. 14 gauge tubing and 1.315" O.D. 12 gauge tubing with welded on 1/4" thick steel plate and will have a multi-stage baked-on powder coat finish. The Push-Out Seat Panel, Push-Out Wall Round Event Panel, Pushout Seat & Supports shall be made from high density 3/4" sheet plastic specially formulated for optimum UV stability and color retention. The Bug Eye Bubble shall be constructed of 3/16" Clear Polycarbonate. The Socket Clamps shall be two-part and precision die-cast from a high strength aluminum alloy and will have a multi-stage baked-on powder coat finish. R5-18030-STL - Orbital Steel Roof The Orbital Shade - Post Connectors shall be fabricated using 2.375" O.D. 11 gauge steel tubing with welded 1/4" thick steel brackets and tabs and shall have a powder coat finish. The Orbital Shade - Curved Extensions shall be fabricated using 5" O.D. 11 gauge steel tubing with a welded 1/4" thick steel cap and 3/8" thick steel brackets and shall have a powder coat finish. The Orbital Steel Roof - Outside Frames shall be fabricated using 2.375" O.D. 11 gauge steel tubing with welded 1/4" thick steel plates and shall have a powder coat finish. The Orbital Steel Roof - Center Plate shall be precision cut from 10 gauge steel and shall have a powder coat finish. The Orbital Steel Roof - Sections shall be precision cut and formed from 0.08" thick aluminum and shall have a powder coat finish. R5-1925 - Hex Net Hub R5 The Hex Net Hub Rubber shall be constructed of UV-stabilized flexible rubber compound with slash proof, reinforced metal inserts. The Hex Net Hub Rubber Plug Top and Bottom shall be machined from high strength aluminum alloy. The Hex Net Hub Nets shall be made from 16mm steel-reinforced rope with high-strength co-polymer plastic intersection connectors and machined aluminum end Ferrules. The Hex Net Hub Top Rail shall be fabricated using 2.375" O.D. 10 gauge steel tubing with welded 3/16" thick steel anchors and 1/4" thick steel mounting brackets and will have a multi-stage baked-on powder coat finish. The Hex Net Rubber Trim shall be made from high density 3/4" sheet plastic specially formulated for optimum UV stability and color retention. The Socket Clamps and Mounting Blocks shall be two-part and precision die-cast from a high strength aluminum alloy and will have a multi-stage baked-on powder coat finish. The Mounting Inserts shall be precision die-cast from a high-strength aluminum alloy. The Socket Clamp Clevis shall be fabricated using 3/16" thick stainless steel. R5 1707 9 U - U-Shaped Tube Slide 108" H The Tube Sections and R5 Tube Slide Panel shall be manufactured from UV-stabilized LLDPE (linear low-density polyethylene) with an average wall thickness of 1/4". The Tube Slide Leg shall be fabricated of 1.660" O.D. 11 gauge tube steel welded to a 3/16" steel plate with a 5/8" rod at the base as a footing Anchor. The Tube Slide Leg will be Powder Coated as specified. The Inclined Tube Support shall be fabricated from a 1/4" steel pipe plug welded to a 1.660" O.D. 11 gauge 90° Support Elbow inserted and welded into a 1.900" O.D. 11 gauge tube steel Support Leg. The Inclined Tube Support will be Powder Coated as specified. R5 1707 8 S - S-Shaped Tube Slide 96" H The Tube Sections and R5 Tube Slide Panel shall be manufactured from UV-stabilized LLDPE (linear low-density polyethylene) with an average wall thickness of 1/4". The Tube Slide Leg shall be fabricated of 1.660" O.D. 11 gauge tube steel welded to a 3/16" steel plate with a 5/8" rod at the base as a footing Anchor. The Tube Slide Leg will be Powder Coated as specified. The Inclined Tube Support shall be fabricated from a 1/4" steel pipe plug welded to a 1.660" O.D. 11 gauge 90° Support Elbow inserted and welded into a 1.900" O.D. 11 gauge tube steel Support Leg. The Inclined Tube Support will be Powder Coated as specified. R5 1602 - Panel Type 2 (HDPE) The Panel Type 2 HDPE shall be made from high density 3/4" sheet plastic specially formulated for optimum UV-stability and color retention. The Flat Panel Bracket shall be precision laser-cut from 3/16" sheet steel and will be Powder Coated as specified. The Mounting Lugs shall be precision die-cast from a high strength aluminum alloy and will be Powder Coated as specified. R5-1601 - Panel Type 1 (Rotomold) The Roto Panel shall be constructed of UV-stabilized, rotationally molded, linear, low density polyethylene with an average wall thickness of .250". The Panel Roto Pipe shall be fabricated using Ø1.315 12ga steel tubing. The Roto Panel Bracket shall be fabricated using 10ga sheet steel and will have a multi-stage baked-on powder coat finish. The Socket Clamps shall be two-part and precision die-cast from a high strength aluminum alloy and will have a multi-stage baked-on powder coat finish. R5-1536 - 180 Degree Crawl-Netix Climbers The Crawl-Netix Flange Stiffeners/Support Arm Panel shall be made from high density 3/4" sheet plastic specially formulated for optimum UV stability and color retention. The Crawl-Netix Net/Tube Support Plate shall be cut from 1/4" thick sheet steel and will be Powder Coated as specified. The Crawl-Netix Net Sections shall be made from 16mm steel-reinforced rope with high-strength co-polymer plastic intersection connectors and machined aluminum and clevises. The Crawl-Netix Rail Sections shall be fabricated using 1.029" O.D. 14 gauge and 1.660" O.D. 11 gauge steel tubing with welded 10 gauge steel plate and steel clevises and will be Powder Coated as specified. The Tube Elbow shall be constructed of UV-stabilized, rotationally molded, linear, low density polyethylene with an average wall thickness of .250". The Split Collar shall be precision cut and formed from 1/4" thick sheet steel and will be Powder Coated as specified. The Crawl-Netix Bottom Support Arm shall be fabricated using 1.900" O.D. 11 gauge, 2.375" O.D. 11 gauge, and 2.875" O.D. schedule 40 steel tubing with welded 1/4" thick steel plate and clamps and will be Powder Coated as specified. The Crawl-Netix Tube Clamp shall be fabricated using 3/16" thick sheet steel with a welded steel ball bearing and will be Powder Coated as specified. The Ball Joint Socket shall be machined from UHMW plastic. R5 1535 - Crawl-Netix Climber R5 The Crawl-Netix Flange Stiffeners shall be made from high density 3/4" sheet plastic specially formulated for optimum UV stability and color retention. The Crawl-Netix Net Plate shall be cut from 1/4" thick sheet steel and will be Powder Coated as specified. The Crawl-Netix Net shall be made from 16mm steel-reinforced rope with high-strength co-polymer plastic intersection connectors and machined aluminum and clevises. The Crawl-Netix Rail shall be fabricated using 1.660" O.D 11 gauge steel tubing with welded 10 gauge steel plate and will be Powder Coated as specified. The Tube Elbow shall be constructed of UV-stabilized, rotationally molded, linear, low density polyethylene with an average wall thickness of .250". The Tube Support Plate shall be cut from 1/4" thick sheet steel and will be Powder Coated as specified. The Roto Panel Leg shall be fabricated using 1.660" O.D 11 gauge steel tubing with welded 3/16" thick bracket, and a 1/4" thick steel plate and will be Powder Coated as specified. The Roto Round Panel shall be constructed of UV-stabilized, rotationally molded, linear, low density polyethylene with an average wall thickness of .250". R5 1405 - Horizontal Ladder Curved The Horizontal Ladder Curved shall be fabricated from 2.375" O.D. 10 gauge tube steel support beams with 1.315" O.D. 12 gauge tube steel rungs uniformly spaced and welded in place. The Horizontal Ladder Curved will be Powder Coated as specified. R5 1309 - Half Wall (Handle) Assembly The Half Wall R5 shall be constructed of 1.315" O.D. 12 gauge tube steel outer rails with 1.029" O.D. 14 gauge tube steel welded vertically. The Half Wall may also have welded mounting tabs and/or plates and will be Powder Coated as specified. R5 1306 - Double Sit Down Slide Hood The Double Sit Down Slide Hood shall be manufactured from UV-stabilized LLDPE (linear low-density polyethylene) with an average wall thickness of 1/4". The Sit Down Slide Hood Top Rail shall be constructed of 1.315" O.D. 12 gauge tube steel and will be Powder Coated as specified. The Sit Down hood Bar shall be constructed of 1.315" O.D. 12 gauge tube steel and 1.029" O.D. 14 gauge tube steel and will be Powder Coated as specified. R5 1303 - Slide Sit Down Hood The Slide Sit Down Hood shall be manufactured from UV-stabilized LLDPE (linear low-density polyethylene) with an average wall thickness of 1/4". The Sit Down Hood Top Rail shall be constructed of 1.315" O.D. 12 gauge tube steel and will be Powder Coated as specified. The Sit Down Hood guard Single shall be constructed of 1.315" O.D. 12 gauge and 1.029" O.D. 14 gauge tube steel and will be Powder Coated as specified. R5 1301 - Wall Steel Bars The Wall Steel Bars shall be fabricated using 1.029" O.D. 14 gauge tube steel welded vertically on 4" centers between vertical 1.315" O.D. 12 gauge tube steel balusters and horizontal 1.315" O.D. 12 gauge tube steel rails, top and bottom and will be Powder Coated as specified. R5 1100 - Deck Identification NO SPECIFICATIONS PC-2439 - Tri Spring Deck The Tri Spring Deck shall be fabricated using punched and formed 12 gauge sheet steel and will be Play-Tuff ™ coated after fabrication. The Playground Event Spring shall be 5-3/4" O.D. with a free height of 14" and will have a multi-stage baked-on powder coat finish. The Event Spring Retainer shall be precision cut and formed from 1/8" thick steel and will have a multi-stage baked on powder coat finish. The Multi-Spring Deck Mounting Plate shall be fabricated using 1/4" thick plate steel and will have a multi-stage baked-on powder coat finish. NF 5302 - NFuse Slither Climber Extension The Slither Climber Support Mount Bracket shall be punched and formed from 3/16" thick sheet steel and will have a multi-stage baked-on powder coat finish. The Slither Climber & Roto Plug shall be constructed of UV-stabilized, rotationally molded, linear, low density polyethylene with an average wall thickness of .250". The Slither Climber Supports shall be fabricated using 1.660" O.D. 11 gauge steel tubing with welded 1/4" thick steel mounting bracket, 5/8" steel anchor (for in-ground version), and 1/4" thick steel anchor plate (for surface mount version) and will have a multi-stage baked-on powder coat finish. The NFuse Slither Climber Extension shall be fabricated using 1-1/2" x 3" x .120" steel rectangular tubing, 1.029" O.D. 14 gauge steel tubing, and 1.315" O.D. 12 gauge steel tubing with welded 1/4" thick steel clevises, 3/16" thick steel clevises, 5/8" steel anchor (for in-ground version), and 1/4" thick steel anchor plate (for surface mount version) and will have a multi-stage baked-on powder coat finish. The Mounting Blocks & Socket Clamps shall be two-part and precision die-cast from a high strength aluminum alloy and will have a multi-stage baked-on powder coat finish. The NFuse Slither Climber Extension Net shall be made from 16mm steel-reinforced rope with high-strength co-polymer plastic intersection connectors and machined aluminum end ferrules. NF-5301 - NFuse Hex Net Extension The Socket Clamp Rope Clevis shall be precision cut and formed using 3/16" stainless steel. The NFuse Hex Net Extension - Frame Rail shall be fabricated using 1-1/2" x 3" x .120" steel rectangular tubing with welded 5/8" steel anchor, 1/4" thick steel clevis, and 3/16" thick steel clevises and will have a multi-stage baked-on powder coat finish. The NFuse Hex Net Extension - Frame Rail - Surface Mount shall be fabricated using 1-1/2" x 3" x .120" steel rectangular tubing with welded 1/4" thick steel anchor plate, 1/4" thick steel clevis, and 3/16" thick steel clevises and will have a multi-stage baked-on powder coat finish. The Mounting Inserts shall be precision die-cast from a high-strength aluminum alloy. The Mounting Blocks & Socket Clamps shall be two-part and precision die-cast from a high strength aluminum alloy and will have a multi-stage baked-on powder coat finish. The NFuse Hex Net Extension - Net shall be made from 16mm steel-reinforced rope with high-strength co-polymer plastic intersection connectors and machined aluminum ferrules. 5205 - NFuse Ring Traverse The NFuse Ring Traverse Weldment shall be fabricated using 1.660" O.D. 11 gauge steel tubing with welded 1/4" plates and 3/16" thick steel hangers and will have a multi-stage baked-on powder coat finish. The NFuse Ring Traverse - Top Inside Weldment shall be fabricated using 2.375" O.D. 10 gauge steel tubing with welded 1/4" plates and 3/16" thick steel clevises (for deck mount version) and will have a multi-stage baked-on powder coat finish. The NFuse Ring Traverse - Rubber Pad shall be constructed of UV-stabilized flexible rubber compound with slash proof, reinforced metal inserts. The Angled Net Link Deck Connector shall be fabricated using 1/4" thick steel with welded 3/16" thick steel clevises and will have a multi-stage baked-on powder coat finish. The NFuse Deck Link Net shall be made from 16mm steel-reinforced rope with high-strength co-polymer plastic intersection connectors and machined aluminum ferrules. 5203 - NFuse Tri-Ring Bay The Socket Clamp Rope Clevis shall be precision cut and formed using 3/16" stainless steel. The NFuse Hex Net Bay - Bracket, Chain Surface Mount Weldment, & Angled Net Link Deck Connector shall be fabricated using 1/4" sheet steel with welded 3/16" thick steel clevises and will have a multi-stage baked-on powder coat finish. The NFuse Tri-Ring Bay - Inner & Outer Rail shall be fabricated using 2.375" O.D. 10 gauge steel tubing with welded 1/4" thick steel plates and 3/16" thick steel clevises and will have a multi-stage baked-on powder coat finish. The Chain shall be 5/0 galvanized chain. The Nets shall be made from 16mm steel-reinforced rope with high-strength co-polymer plastic intersection connectors and machined aluminum ferrules. The NFuse Tri-Ring Bay - S-Plate shall be precision cut from 10 gauge stainless steel. The Tri-Ring shall be constructed of UV-stabilized, rotationally molded, linear, low density polyethylene with an average wall thickness of .250". The Mounting Inserts shall be precision die-cast from a high-strength aluminum alloy. The Mounting Blocks & Socket Clamps shall be two-part and precision die-cast from a high strength aluminum alloy and will have a multi-stage baked-on powder coat finish. 5201 - NFuse Hex Net Bay The Socket Clamp Rope Clevis shall be precision cut and formed using 3/16" stainless steel. The NFuse Hex Net Bay - Bottom Weldment shall be fabricated using 1.660" O.D. 11 gauge steel tubing with welded 1/4" thick steel plates and 3/16" thick steel clevises and will have a multi-stage baked-on powder coat finish. The NFuse Hex Net Bay - Bracket shall be fabricated using 1/4" sheet steel with welded 3/16" thick steel clevises and will have a multi-stage baked-on powder coat finish. The NFuse Hex Net Bay - Top Inside & Top Outside Weldment shall be fabricated using 2.375" O.D. 10 gauge steel tubing with welded 1/4" thick steel plates and 3/16" thick steel clevises and will have a multi-stage baked-on powder coat finish. The Mounting Inserts shall be precision die-cast from a high-strength aluminum alloy. The Mounting Blocks & Socket Clamps shall be two-part and precision die-cast from a high strength aluminum alloy and will have a multi-stage baked-on powder coat finish. The NFuse Hex Net Bay - Nets shall be made from 16mm steel-reinforced rope with high-strength co-polymer plastic intersection connectors and machined aluminum ferrules. The Angled Net Link Deck Connector shall be fabricated using 1/4" thick steel with welded 3/16" thick steel clevises and will have a multi-stage baked-on powder coat finish. 5103 - NFuse Geo-Hex Wall Frame The NFuse Geo Hex Wall Frame shall be fabricated using 1-1/2" x 3" Rectangle Tube and 1/4" thick steel clevises and tabs and will have a multi-stage baked-on powder coat finish. The NFuse Geo-Hex Wall Frame HDPE shall be made from high density 3/4" sheet plastic specially formulated for optimum UV stability and color retention. The Mounting Blocks & Lugs shall be two-part and precision die-cast from a high strength aluminum alloy and will have a multi-stage baked-on powder coat finish. The Socket Clamps shall be two-part and precision die-cast from a high strength aluminum alloy and will have a multi-stage baked-on powder coat finish. 5102 - NFuse 2-Rung Access Ladder Frame The NFuse 2-Rung Access Ladder Frame shall be fabricated using 1-1/2" x 3" Rectangle Tube, 1.315" O.D. 12 gauge steel tubing and 1/4" thick steel Clevises and will have a multi-stage baked-on powder coat finish. The Mounting Blocks shall be two-part and precision die-cast from a high strength aluminum alloy and will have a multi-stage baked-on powder coat finish. 1974 - Gyro-Pod Spinner The Gyro-Pod Capsule Leg shall be fabricated using 2.375" O.D. 10 gauge steel tubing with welded 1/4" x 1-1/2" flat steel reinforcement plates and stainless steel ball bearing and will be Powder Coated as specified. The Gyro-Capsule Top Frame shall be fabricated using 2.375" O.D. 11 gauge steel tubing with welded 1.900" O.D. 11 gauge steel supports, 1/4" thick stainless steel mounting brackets and stainless steel ball bearing and will be Powder Coated as finished. The Gyro-Pod Bearing Hub shall be fabricated using 2-1/4" O.D. machined steel hub with welded 1/4" thick steel plate and will be Powder Coated as specified. The Gyro-Pod Handrail shall be fabricated using 1.315" O.D. 12 gauge steel tubing with welded 1/4" thick steel mounting plates and will be Powder Coated as specified. The Gyro-Pod Tread Plate shall be made from punched 14 gauge sheet steel and shall be Play-Tuff(TM) coated after fabrication. The Gyro-Pod Ring Plate shall be made from precision cut 1/4" thick sheet steel and will be Powder Coated as specified. The Gyro-Pod End & Ring shall be constructed of UV-stabilized, rotationally molded, linear, low density polyethylene with an average wall thickness of .250". The Gyro-Pod Ring Spacer shall be machined from high strength aluminum alloy and will be Powder Coated as specified. The Ball Joint Socket Half shall be made from Ultra High Molecular Weight Polyethylene for lasting durability and minimal rotational resistance. The Split Collar Half shall be made from precision cut and formed 1/4" thick stainless steel and will be Powder Coated as specified. 1963 - Seat on Post The Steel Lily Pad shall be fabricated using 12 gauge punched and formed sheet steel and shall be Play-Tuffâ„¢ coated after fabrication. The Seat on Post R5/R3.5 shall be fabricated using 1.315 O.D. 12 gauge steel tubing and shall have a powder coat finish. The Seat on Post RV shall be fabricated using 1.315" O.D. 12 gauge steel tubing with welded 1/4" thick stainless steel mounting brackets and shall have a powder coat finish. 1962 - Play Seat The Play Seat shall be punched and formed from 14 gauge sheet steel and shall be Play-Tuff(TM) coated after fabrication. The Mounting Blocks shall be two-part and precision die-cast from a high strength aluminum alloy and will be Powder Coated as specified. 1803 STL - Steel Hex Roof The Steel Hex Roof Corner Bracket shall be formed from 10 gauge sheet steel and will be Powder Coated as specified. The Steel Hex Roof Section and Cap shall be formed from 14 gauge sheet steel and will be Powder Coated as specified. 1705 - Quarter Turn Slide The Quarter Turn Slide shall be manufactured from UV-stabilized LLDPE (linear low- density polyethylene) with an average wall thickness of 1/4". The Single Slide Leg shall be fabricated of 1.660" O.D. 11 gauge tube steel welded onto a 10 gauge steel plate and will be Powder Coated as specified. The Quarter Turn Slide Support shall be fabricated of 1.660" O.D. 11 gauge tube steel welded to a 1/4" steel plate and will be Powder Coated as specified. 1702 - Double Slide The Double Slide Spacer shall be fabricated using punched and formed 12 gauge sheet Steel and shall be Play-Tuff(TM) coated after fabrication. The Double Slide shall be manufactured from UV-stabilized LLDPE (linear low-density polyethylene) with an average wall thickness of 1/4". The Double Slide Leg shall be fabricated of 1.660" O.D. 11 gauge tube steel welded onto a 3/16" plate steel with a 5/8" steel rod welded to the base as a footing anchor and will be Powder Coated as specified. The Slide Support shall be fabricated of 1.660" O.D. 11 gauge steel tubing welded onto a 3/16" steel plate with a 5/8" steel rod welded to the base as a footing anchor and will be Powder Coated as specified. 1501 1502 - Arch Bridge The Arch Bridge shall be fabricated using punched, formed, and welded 12 gauge sheet steel and shall be Play-Tuff(TM) coated after fabrication. The Arch Bridge Rails shall be fabricated using 1.660 O.D. 11 gauge steel tubing, 1.315" O.D. 12 gauge steel tubing and 1.029" O.D. 14 gauge steel tubing with 1/4" HR Steel and 10 gauge HR Steel mounting brackets and will have a multi-stage baked-on powder coat finish. The Arch Bridge Wall and Trim shall be made from high density 3/4" sheet plastic specially formulated for optimum UV stability and color retention. The Arch Bridge Wall Stiffener shall be made from 1-1/4" HR flat bar and 3/8" HR steel and will have a multi-stage baked-on powder coat finish. The Socket Clamps shall be two-part and precision die-cast from a high strength aluminum alloy and will have a multi-stage baked-on powder coat finish. 1414 1 - Lily Pad Seat-Step Assembly The Lily Pad No Hole shall be constructed of UV-stabilized, rotationally molded, linear, low density polyethylene with an average wall thickness of .250". The Step Pad Step Leg shall be fabricated using 1.660" O.D. 11 gauge steel tubing with welded 1/4" thick steel mounting plate and will be Powder Coated as specified. 1414 - Lily Pad Step-Up The Lily Pad No Hole shall be constructed of UV-stabilized, rotationally molded, linear, low density polyethylene with an average wall thickness of .250". The Lily Pad Step Leg shall be fabricated using 1.660" O.D. 11 gauge steel tubing with welded 1/4" thick steel mounting plate and will be Powder Coated as specified. The Lily Pad Step-Up Handrail shall be fabricated using 1.315" O.D. 12 gauge steel tubing and will be Powder Coated as specified. The Socket Clamps shall be two-part and precision die-cast from a high strength aluminum alloy and will be Powder Coated as specified. 1400 - End Access Ladder The End Access Ladder shall be fabricated using 1.315" OD, 12 gauge steel tubing and will be Powder Coated as specified. The Socket Clamps shall be two-part and precision die-cast from a high strength aluminum alloy and will be Powder Coated as specified. 1313 - Curved Post Handle The Curved Post Handle shall be 1.315" O.D. 12 gauge steel tubing and will be Powder Coated as specified. 1261 - Ebb & Flow Climber The Ebb & Flow Climber Frame, and Platform Rail shall be fabricated using 1.900" O.D. 11 gauge steel tubing with welded 1/4" and 3/16" thick steel clevises and 1.900" steel mount plugs and will be Powder Coated as specified. The Ebb & Flow Anchor Brackets shall be fabricated using 1/4" thick stainless steel and will be Powder Coated as specified. The Ebb & Flow Horizontal Strut shall be fabricated using 1.900" O.D. 11 gauge steel tubing with welded 3/16" thick steel clevises and 1.900" steel mount plug pins and will be Powder Coated as specified. The Ebb & Flow Deck Plate shall be fabricated using 1/4" thick steel plating with welded 3/16" thick steel clevises and will be Powder Coated as specified. The Ebb & Flow Nets shall be made from 16mm steel-reinforced rope with high-strength copolymer plastic intersection connecters and machined aluminum ferrules. The Mounting Blocks shall be two-part and precision die-cast from a high strength aluminum alloy and will be Powder Coated as specified. The Socket Clamps shall be two-part and precision die-cast from a high strength aluminum alloy and will be Powder Coated as specified. 1209 - Transfer Station The Steps & Decks shall be fabricated from 12 gauge punched sheet steel with reinforcing cross members and gussets. Each Step and Deck shall be Play-Tuff(TM) coated after fabrication. The Step Rails shall be fabricated from 1.315" O.D. 12 gauge and 1.660" O.D. 11 gauge steel tubing and will be powder coated as specified. The Step Deck Legs shall be fabricated from 1.660" O.D. 11 gauge steel tubing welded to a 10 gauge mounting bracket. The Step Deck Leg will be Powder Coated as specified. 1102 - Tri Deck Assembly The Tri Deck shall be constructed using 12 gauge sheet steel which shall be formed and fabricated into required designs and punched with a uniform hole pattern and will be Play-Tuff(TM) coated after fabrication. The Mounting Blocks shall be two part and precision die- cast from a high strength aluminum alloy and will be Powder Coated as specified. 1101 - Square Deck Assembly The Square Deck shall be constructed using 12 gauge sheet steel which shall be formed and fabricated into required designs and punched with a uniform hole pattern. The Decks will be Play-Tuff(TM) coated after fabrication. The Mounting Blocks shall be two part and precision die- cast from a high strength aluminum alloy. The Mounting Blocks will be Powder Coated as specified.